JFK New Terminal 6 Design-Build

Port Authority of New York and New Jersey

The $3.9 billion new Terminal 6 at John F. Kennedy International Airport (JFK) is a major piece of the full redevelopment of JFK into a leading global airport. The 1.2 million-sf terminal will feature nine wide-body aircraft gates and adjoin Terminal 5. It replaces the former Terminal 6 and the existing Terminal 7, which will be demolished.

EnTech, as part of the design-build team, is providing geotechnical instrumentation and monitoring services including vibration monitoring, noise monitoring, settlement monitoring, utility monitoring, and preconstruction and post-construction condition surveys. The firm is additionally supplying virtual design and construction (VDC) services including laser scanning and construction progress tracking.

Key Services

  • Vibration monitoring

  • Noise monitoring

  • Settlement monitoring

  • Utility monitoring

  • Preconstruction/post-construction surveys

  • Laser scanning

  • Construction progress tracking