JFK New Terminal 6 Design-Build
Port Authority of New York and New Jersey
The $3.9 billion new Terminal 6 at John F. Kennedy International Airport (JFK) is a major piece of the full redevelopment of JFK into a leading global airport. The 1.2 million-sf terminal will feature nine wide-body aircraft gates and adjoin Terminal 5. It replaces the former Terminal 6 and the existing Terminal 7, which will be demolished.
EnTech, as part of the design-build team, is providing geotechnical instrumentation and monitoring services including vibration monitoring, noise monitoring, settlement monitoring, utility monitoring, and preconstruction and post-construction condition surveys. The firm is additionally supplying virtual design and construction (VDC) services including laser scanning and construction progress tracking.
Key Services
Vibration monitoring
Noise monitoring
Settlement monitoring
Utility monitoring
Preconstruction/post-construction surveys
Laser scanning
Construction progress tracking